3D Product Explanation Animation
Budget: ₹12,500 – ₹37,500 INR
The below is the summary of the project.
The HMDA is taking up the excavation works for the connectivity of service road for a width of about 25 meters and for a length of about 1.60 kms. The proposed site falls in a Hilly and rocky terrane, with a maximum height being 20 meters and minimum being 3 meters.
We propose to take up this excavation in 2 layers by Control Blasting & the edge Boulders with Chemical Blasting and by using pneumatic breakers and chiseling to have additional protection against the toppling of rocks on to the ORR, with a hard barricade of 6-8 meters on the road and we will be using excavators and dumpers to shift the excavated materials to the dump yard.
The requirement is of a short video of about 1 minute duly showing the road excavation by blasting and removal of excavated materials with excavators and dumpers and shifting the materials to the Dump yards.
The HMDA is taking up the excavation works for the connectivity of service road for a width of about 25 meters and for a length of about 1.60 kms. The proposed site falls in a Hilly and rocky terrane, with a maximum height being 20 meters and minimum being 3 meters.
We propose to take up this excavation in 2 layers by Control Blasting & the edge Boulders with Chemical Blasting and by using pneumatic breakers and chiseling to have additional protection against the toppling of rocks on to the ORR, with a hard barricade of 6-8 meters on the road and we will be using excavators and dumpers to shift the excavated materials to the dump yard.
The requirement is of a short video of about 1 minute duly showing the road excavation by blasting and removal of excavated materials with excavators and dumpers and shifting the materials to the Dump yards.