Marine Project
Budget: $1,500 – $3,000 USD
We have 03 floating barge of desalination plant, need to prepare the Study of Lying of Flexible Hoses and sewage water pipe under sea bed till the shore.
Related categories:
Engineering
3D Rendering
Mechanical Engineering
Chemical Engineering
3D Modelling