Hello, i have a request for a 3D Animation Video of a Road. -- 2
Budget: €30 – €250 EUR
3D Animation Specifications – Aktiv Asfalt
1. A scene showing heavy traffic and large vehicles gradually causing a rut in the asphalt.
(A wheel track depression approximately the width of a truck tire, about 5 cm deep, and extending over a significant length.)
2. A scene featuring an asphalt milling machine removing the deformed section of the road.
3. A scene where a machine lays down new asphalt in the milled area.
(The asphalt should appear porous and slightly rough. A close-up shot highlighting its texture is recommended.)
4. A scene where a road roller compacts the newly laid asphalt.
5. A scene where a concrete mixer pours a cement-based solution over the porous asphalt.
(The solution should seep into the asphalt, filling the gaps. A close-up shot showing this absorption process and the subsequent hardening is recommended.)
6. A scene featuring a worker using a squeegee to remove excess material and evenly spread the solution.
7. A scene where traffic resumes, with a truck driving over the repaired section.
8. The animation ends with the Aktiv Asfalt logo.
(Throughout the animation, the Aktiv Asfalt logo should be visible in the top right corner. It should be clear and noticeable. Additionally, all equipment should be branded with the Aktiv Asfalt logo, and workers should wear high-visibility vests featuring the company’s branding.)
1. A scene showing heavy traffic and large vehicles gradually causing a rut in the asphalt.
(A wheel track depression approximately the width of a truck tire, about 5 cm deep, and extending over a significant length.)
2. A scene featuring an asphalt milling machine removing the deformed section of the road.
3. A scene where a machine lays down new asphalt in the milled area.
(The asphalt should appear porous and slightly rough. A close-up shot highlighting its texture is recommended.)
4. A scene where a road roller compacts the newly laid asphalt.
5. A scene where a concrete mixer pours a cement-based solution over the porous asphalt.
(The solution should seep into the asphalt, filling the gaps. A close-up shot showing this absorption process and the subsequent hardening is recommended.)
6. A scene featuring a worker using a squeegee to remove excess material and evenly spread the solution.
7. A scene where traffic resumes, with a truck driving over the repaired section.
8. The animation ends with the Aktiv Asfalt logo.
(Throughout the animation, the Aktiv Asfalt logo should be visible in the top right corner. It should be clear and noticeable. Additionally, all equipment should be branded with the Aktiv Asfalt logo, and workers should wear high-visibility vests featuring the company’s branding.)