GCC PROJECT - 03/04/2026 11:32 EDT
Budget: $30 – $250 USD
Hi
This is to confirm our agreement for the project with Engineer Ahmed:
We are looking to refine and develop the existing cultural complex design with the following requirements:
• Adjust the floor plans to create more open and flexible spaces, reflecting a cultural hub rather than a typical building layout
• Reduce the number of labs and meeting rooms where possible
• Introduce more double-height spaces to enhance spatial quality
• Minimize long corridors with rooms on both sides, and improve overall flow
• Modify the lake design — we want to keep the same concept but make the shape sharper and more defined
• Refine the building masses — make them cleaner and more solid (less fragmented), similar to the reference shared
• Increase the spacing between buildings to create better outdoor areas
• Strengthen the connection between buildings and landscape
• Apply a façade pattern on the cube forms (reference will be provided)
Delivery Timeline:
• Main delivery: Sunday night
• Final completion: Monday
Please ensure all agreed modifications are completed within this timeline.
This is to confirm our agreement for the project with Engineer Ahmed:
We are looking to refine and develop the existing cultural complex design with the following requirements:
• Adjust the floor plans to create more open and flexible spaces, reflecting a cultural hub rather than a typical building layout
• Reduce the number of labs and meeting rooms where possible
• Introduce more double-height spaces to enhance spatial quality
• Minimize long corridors with rooms on both sides, and improve overall flow
• Modify the lake design — we want to keep the same concept but make the shape sharper and more defined
• Refine the building masses — make them cleaner and more solid (less fragmented), similar to the reference shared
• Increase the spacing between buildings to create better outdoor areas
• Strengthen the connection between buildings and landscape
• Apply a façade pattern on the cube forms (reference will be provided)
Delivery Timeline:
• Main delivery: Sunday night
• Final completion: Monday
Please ensure all agreed modifications are completed within this timeline.