Engineering of the concentrator of the copper mine in Australia
Budget: $50,000 – $0 USD
1. 3 million tons/year raw ore processing capacity, producing 500,000 tons of copper concentrate with a production-grade of 25%
2. According to the Australian Standards
2. Need 3D designing illustration
3. Need VR designing
2. According to the Australian Standards
2. Need 3D designing illustration
3. Need VR designing