Pouring a concrete Slab

Job ID: 33404207

Budget: $250 – $750 USD

I need an animation that explains how a concrete slab is poured. The foundation plans are attached and the following is the progression of the animation:
- Bulldozers come in and level the dirt to create a pad site.
- Excavators dig out the perimeter of the site for concrete beams.
-The plumbers dig out trenches and lay PVC pipe and stub up pipes that will stick out of the poured concrete according to the "for construction" plans
- The concrete team comes in and lays a tarp over the pad site and then ties in rebar.
- The concrete is poured on top of the rebar using a pump truck.